Specifying Lined Branch Connections in Chlor-Alkali Service
A chlor-alkali site can have separate transfer, sampling and dosing streams with different compositions. A branch fitting may operate under a different combination of temperature, phase and flow from the main run. Record what each branch handles during production, isolation and maintenance.
Equipment and lining options
Specify the steel shell and requested fluoropolymer lining independently. For a valve, identify the ball or disc, seat, stem and any exposed internals. Compare PTFE and PFA proposals against the exact medium and duty. Use drawings to check the branch bore and access to bolts and operators.
What to include in an RFQ
Supply line tags, normal and exceptional service cases, both run diameters, branch size and required facing. For existing equipment, attach a measured view and flag differences from the old drawing.
Related equipment and technical guidance
- PTFE-Lined Tees
- PTFE-Lined Valves
- PTFE-Lined Steel Pipes
- How to Specify a PTFE-Lined Tee Branch
- Chlor-Alkali Industry Lined Equipment
- Send a project RFQ
Discuss your application
Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.