Chlor-Alkali Industry Lined Equipment
Identify the fluid at each point in the line, with concentration and phase where known. Separate normal production duty from cleaning, start-up and abnormal operation.
Project requirements
Submit an equipment schedule with material requests, design cases and the proposed inspection scope.
Relevant equipment
Application guides
Use these guides to define the service inputs, equipment interfaces and inspection scope before issuing a quotation request.
Engineering review
Submit media by line and branch, including concentration and phase. Quote components as a system where isolation, sampling and transfer share interfaces.