Packaging a Lined Chemical Storage and Pipeline RFQ
A project may source its storage tank and connecting pipework separately. Without a common drawing reference, suppliers can assume different nozzle orientations and flange schedules. Record boundaries, responsibilities and delivery order for each package.
Equipment and lining options
Treat the tank lining and pipe lining as separate equipment systems. Match flanges, clear bores and liner faces between them. Confirm the transfer conditions, filling sequence and cleaning schedule. Assign independent tags to the tank, spools, branch fittings and ancillary items.
What to include in an RFQ
Submit a single reference drawing and issue a schedule by item, quantity, location and desired inspection record. Ask for scope departures to be clearly listed so offers can be compared.
Related equipment and technical guidance
- PTFE Sheet-Lined Tanks
- PTFE-Lined Pipe Spools
- PTFE-Lined Tees
- How to Prepare a PTFE-Lined Piping Line List
- Corrosive Chemical Handling Lined Equipment
- Send a project RFQ
Discuss your application
Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.