Packaging a Lined Chemical Storage and Pipeline RFQ

A project may source its storage tank and connecting pipework separately. Without a common drawing reference, suppliers can assume different nozzle orientations and flange schedules. Record boundaries, responsibilities and delivery order for each package.

Chemical storage terminal and industrial transfer infrastructure
Industry context: Chemical storage terminal and industrial transfer infrastructure

Equipment and lining options

Treat the tank lining and pipe lining as separate equipment systems. Match flanges, clear bores and liner faces between them. Confirm the transfer conditions, filling sequence and cleaning schedule. Assign independent tags to the tank, spools, branch fittings and ancillary items.

Horizontal steel PTFE sheet-lined storage tank with a large lined opening
Illustrative product reference: Horizontal steel PTFE sheet-lined storage tank with a large lined opening

What to include in an RFQ

Submit a single reference drawing and issue a schedule by item, quantity, location and desired inspection record. Ask for scope departures to be clearly listed so offers can be compared.

Discuss your application

Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.