Specifying Lined Pipework for an Acid Transfer Skid

An unloading skid can see acid during transfer, water during a flush and an idle period with trapped liquid. Record each state from the truck connection to the day tank. Concentration and temperature can change when flush water first contacts residue. The design team should identify where liquid is retained between closed valves or at low points.

Pipe racks and process structures inside a chemical industrial facility
Industry context: Pipe racks and process structures inside a chemical industrial facility

Equipment and lining options

Use a tagged line list to separate straight steel pipe, replaceable spools and valve assemblies. PTFE and PFA are distinct material options. Ask the supplier to identify the exact liner and valve trim on each tag. Check pump connection dimensions, fixed or loose flange requirements and operator access independently.

Bores of large diameter PTFE-lined steel pipe sections
Illustrative product reference: Bores of large diameter PTFE-lined steel pipe sections

What to include in an RFQ

Issue the isometric, service-state table, mating flange schedule and tagged quantities. Ask suppliers to mark connection and liner assumptions against the drawing so the installation team can compare offers on the same basis.

Discuss your application

Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.