Putting Together an Inspection Request for Lined Equipment
Start with a drawing and an agreed lining boundary. Define which areas can be reached, whether covers are removable and which surfaces or interfaces the inspection should record.
Dimensions and service inputs
Request the proposed visual and dimensional checks, documentation and any relevant lining-integrity method with a procedure appropriate to the specific lining and thickness.
Before issuing the RFQ
If a witness or hold point matters, include it in the quotation request. Keep inspection requirements linked to the exact drawing revision and equipment tags so records are traceable.
Make acceptance records traceable
List each deliverable against the component tag and drawing revision. A table can separate drawing approval, visual and dimensional inspection, lining inspection where applicable, and packing records. Identify what the buyer needs to see before shipment.
Related products
Related information
- Custom PTFE-Lined Equipment
- Custom Rubber-Lined Equipment
- PTFE Sheet-Lined Vessels
- Request a project quotation
- Technical resources
- Materials Review for Battery Materials Process Equipment
Discuss your application
Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.