Putting Together an Inspection Request for Lined Equipment

Start with a drawing and an agreed lining boundary. Define which areas can be reached, whether covers are removable and which surfaces or interfaces the inspection should record.

Large industrial component in equipment used for rubber lining
Industry context: Large industrial component in equipment used for rubber lining

Dimensions and service inputs

Request the proposed visual and dimensional checks, documentation and any relevant lining-integrity method with a procedure appropriate to the specific lining and thickness.

Open vessel interior illustrating the PTFE sheet lining of custom equipment
manufacturing catalogue, p. 02: sheet-lined vessel interior.

Before issuing the RFQ

If a witness or hold point matters, include it in the quotation request. Keep inspection requirements linked to the exact drawing revision and equipment tags so records are traceable.

Make acceptance records traceable

List each deliverable against the component tag and drawing revision. A table can separate drawing approval, visual and dimensional inspection, lining inspection where applicable, and packing records. Identify what the buyer needs to see before shipment.

Discuss your application

Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.