Choosing a Layout for a Glass-Lined Storage Tank

A vertical or horizontal tank arrangement affects the footprint, supports and maintenance clearance. Start with the available footprint and lifting route as well as the required working volume.

Chemical storage terminal and industrial transfer infrastructure
Industry context: Chemical storage terminal and industrial transfer infrastructure

Dimensions and service inputs

Translate the process connections into a nozzle schedule. Show elevations and orientation for filling, venting, level instrumentation and draining so the drawing can be checked against the installation.

Horizontal glass-lined steel storage tank on supports
Illustrative product reference: Horizontal glass-lined steel storage tank on supports

Before issuing the RFQ

Review the intended fluids, including cleaning media and service transients, against the proposed glass lining. Obtain the project-specific equipment specification before selecting a model.

Allow room for removal and inspection

For a horizontal vessel, show saddle locations and how the vessel can be lifted. For a vertical arrangement, mark nearby structures and the clearance required to remove covers or inspect equipment at floor level. Review how access to fittings and supports changes after nearby pipework is installed. Add the removal sequence to the equipment layout when access is limited.

Discuss your application

Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.