Checking Mating Interfaces on Fluoropolymer-Lined Piping
A flange check starts with the mating components. Capture the drilling, bolt circle, flange facing, bore and whether the end is fixed or can rotate.
Dimensions and service inputs
Check how the protruding liner face sits next to the adjoining component. Identify any spacer, gasket or blind in the joint design and confirm the installation method with the equipment supplier.
Before issuing the RFQ
Make the flange schedule part of the RFQ. Where an old drawing and the field dimensions differ, identify the discrepancy before manufacturing.
Capture the mismatch before ordering
If a new rotating flange mates with an existing fixed flange, record which bolt positions have to align and what tool clearance is available. For a spacer or blind, specify its thickness separately so the planned pipe length includes it.
Related products
Related information
- PTFE-Lined Flange Connections
- PTFE-Lined Pipe Spools
- PTFE-Lined Valves
- Request a project quotation
- Technical resources
- Planning Lined Spool Replacement During a Petrochemical Shutdown
Discuss your application
Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.