Lining Selection for Bleach Chemical Transfer in Pulp and Paper
Chemical unloading, storage and distribution around a pulp mill can expose equipment to different concentrations and temperatures. Record how often a transfer line is idle and flushed. Include thermal cycles and any steam, hot-water or cleaning connections separately from the normal process medium.
Equipment and lining options
A PTFE-lined pipework option requires compatible flanges and reviewed liner conditions. A valve assembly adds seat, stem and closure data. PFA is a separate fluoropolymer option and should be identified as such in the supplier submission. Storage equipment needs a separate working-volume and vent review.
What to include in an RFQ
Send transfer and cleaning schedules, line tags, valve function and the tank drawing. Identify which existing flange connections will remain installed.
Related equipment and technical guidance
- PTFE-Lined Steel Pipes
- PTFE-Lined Valves
- PTFE Sheet-Lined Tanks
- Preparing a Request for PTFE-Lined Isolation Valves
- Water Treatment Lined Equipment
- Send a project RFQ
Discuss your application
Send the medium, operating conditions and mating dimensions for the parts under review. If the project is a replacement, include the existing equipment tag and drawing revision.